Back to category

AED-065
Aeronautical regulation - certification - quality control - 2020

Certification Specifications (CS-25) powerplant

OBJECTIVE :

Present and understand the CS-25 certification specifications related to Powerplant (subpart E) and associated subparts:

  • Subpart F Equipment (25.1305, 25.1337)
  • Subpart G Operating Limitations & Information (25.1521 to 25.1557)
  • Subpart H EWIS (25.1725, 25.1731)
  • Subpart J APU comparison with subpart E requirements

As well as the related compliance demonstrations.

This course applies to engineers wishing to improve their regulatory knowledge in the Powerplant (engine installation, aircraft interface) and associated domains (controls, fuel, fire protection, operations).

COURSE DURATION AND TIMETABLE :

Course duration is 1 day (6 hours).

GENERAL APPROACH :

CS-25 certification specifications and their interpretation (Acceptable Means of Compliance, Guidance Material) will be reviewed while underlining the key requirements, salient compliance demonstrations, illustrated with and lessons learnt.

PREREQUISITE :

Level: Basic / Improvement

Basic turbine engine knowledge (including Propellers).

This course may constitute a specialised complement to AED 066 course (focused on part 21 certification procedures & including CS- 25 general overview).

COURSE DIRECTOR(S) :

Gérard MEUREY:

Graduate Aeronautics Engineer

Consultant in Airworthiness domains

Previous Head of Airworthiness Beriev-Irkut-Seaplane (Be-200)

8 years in CEAT and 34 years in Airbus Office of Airworthiness

CS25 Teacher at French ENAC school.

CONTENT :

  • CS-25 Subpart E "Powerplant"
  • General
    • Background
    • Engine approval (CS E)
  • Powerplant organization of CS 25 Requirements
  • Subpart E review
    • General requirement
    • Fuel system
    • Oil system
    • Cooling
    • Air intake and exhaust system
    • Controls, instruments and accessories
    • Fire protection
  • CS-25 Subpart F "Equipment"
    • Powerplant instruments
  • CS-25 Subpart G "Operating limitations & information"
    • Operating limitations
    • instruments
    • Markings
  • CS-25 Subpart H "EWIS"
    • EWIS associated to Powerplant
    • Powerplant and APU fire detector system
  • CS-25 Subpart J "APU"
    • APU approval (ETSO)
    • Comparison with subpart E requirements
  • Powerplant Change approval process
    • Specific classification
    • Approval process

WHEN AND WHERE :

Scheduled in French:

TOULOUSE : 15 May 2020

 

For the English realization, please, consult us.

COURSE FEES :

€570 excluding tax (20% VAT)

See general terms

Dowload pdf
Print
Download registration form
Contact us